RCSI TOILET BLOCK

Client

Royal College of Surgeons – Estates Department

Consultant

Synnott Design

Location

123 St. Stephens Green, Dublin 2

Key Features

JSD Contracting completed the refurbishment of 1st Floor Toilet facilities and installation of a disabled lift

 

This project included strip out and removal of redundant material and fittings; demolitions and removals; new floor; wall & ceiling finishes; sanitaryware; new lift and stairs-repairs to historic protected windows and metalwork.

 

Installation of new lift involved the widening of the general circulation corridor, the installation of a new lift platform, the renovation of the bathroom areas and associated works on first floor to improve disability access. 

Previous
Next

Previous Project

Next Project