LOCATION
Burlington Road, Dublin 4.CONSTRUCTED
2022VALUE
€2.10MCLIENT
Sky IrelandCONSULTANTS
Architect: Scott Tallon Walker Architects
Structural Engineer: JAE Engineering
This project involved the strip out, reconfiguration and refurbishment of Sky Ireland Headquarters in Dublin. The duration undertaken on a phased basis over two floors within a live building environment.
Works included removal of internal walls, floor coverings and ceilings, construction of new glazed partitions, stud partitions and ceilings throughout, new flooring throughout, upgrade fireproofing throughout, new mechanical and electrical installations.
Specialist joinery and canteen specialist. Project duration was 19 weeks.